Our Process

Five steps, written down, so nothing is a surprise

Every AGP project (from a drywall repair to a full build-out) runs the same visible sequence. Here's what happens, what you get at each step, and who's responsible for it.

Step by Step

How a project actually runs

1. Site walk & scope

It starts with boots on your floor, not a form letter. We walk the space with you, measure what matters, open the ceiling tile nobody has looked above in a decade, and ask the questions that change budgets: what stays, what goes, what can't be down during business hours. You get a written scope: including, when it's true, the list of things we think you shouldn't pay for.

2. Line-item bid

The bid shows its work: quantities, allowances, exclusions and assumptions, stated plainly enough to compare against anyone else's number. If a cheaper bid crosses your desk, you'll be able to find exactly which line it's missing. We'd rather lose a job on an honest number than win it on a vague one and argue later.

3. Permits & scheduling

We prepare and submit the permit package, chase plan review, and build the construction schedule against real lead times (steel, glass, mechanical equipment) not optimistic ones. Before mobilization you know the start date, the milestones, and the date we intend to hand you keys.

4. The build

A named superintendent runs your site and answers his phone. You get a weekly update you don't have to chase: what happened, what's next, what we need from you and by when. Occupied-building rules (dust barriers, after-hours noise, clean corridors) are enforced as site standards, not favors. When something in the building disagrees with the drawings (and in remodel work, something will) you hear about it while it's still a small decision.

5. Punch & closeout

We walk the finished space together and write the punch list; then it gets closed fast, because a lingering punch list is how good projects get remembered badly. Closeout hands you the full file: inspections passed, certificate of occupancy where applicable, lien waivers, warranties and as-builts in one package your lender or landlord can actually use.

At a Glance

The same five steps, every time

01

Walk & scope

Boots on site, written scope, honest first read on budget and calendar.

02

Line-item bid

Quantities and allowances shown, exclusions stated, comparable on purpose.

03

Permits & schedule

Permit package submitted, milestones set against real lead times.

04

The build

Named superintendent, weekly updates, occupied-space discipline.

05: Punch & closeout: the walk, the list, the fast close, and a complete closeout package. Then, for most clients, the relationship continues on the maintenance side. The crew that built it keeps it standing.

The Honest Part

Change orders, handled like adults

Change orders have a deserved bad reputation, because some contractors bid low and live on them. Ours work differently: a change order exists only when the scope actually changes. You asked for something new, or the building revealed something no walkthrough could see. It gets priced in writing, approved by you before the work happens, and tracked in the weekly update. No verbal "we'll sort it out later," because later is where budgets go to die.

Reviewing project plans and schedule Closing the project with a handshake

FAQ

Process questions, answered straight

How fast do we get a bid?

Simple maintenance scopes are typically priced within days of the walkthrough; full build-outs take longer because honest quantities take longer than guesses. At the walkthrough we'll tell you the bid date, and then hit it.

Do you charge for bids?

No: walkthroughs and bids are free. Where a project needs design work or engineering before it can be priced responsibly, we'll say so up front and scope that separately, before anyone spends money.

Who is my point of contact during the build?

Your superintendent: one name, one phone number, on your site. Ownership stays close to every job, but you'll never have to guess who's responsible for an answer.

What happens if the schedule slips?

You hear about it the week it threatens, not the week it happens: with the cause named and the recovery plan attached. Weather, lead times and inspections are real; silence about them is the part we consider unacceptable.

See step one this week.

The process starts with a walkthrough. Tell us where and when.